As an efficient and low-cost international freight transportation mode, long-distance pipeline is vulnerable to invasion when crossing the mountainous areas where geological disasters occur frequently. Because of its shallow buried pipeline, thin-shell steel tube structure, containing high-pressure flammable and explosive medium, the accident has serious consequences. Lanzhou-Chengdu-Chongqing oil pipeline has undergone several rockfall impact pipeline incidents, which seriously threaten the normal operation of gas pipeline. It is imperative and urgent to carry out research on the impact safety protection technology of rockfall on pipeline.
Based on the energy conservation law, Hertz elastic collision theory and incomplete elastic collision theory, the dynamic equilibrium formula of rockfall impact oil and gas pipeline is established to obtain the maximum impact pressure. Flac 6.0 software is used to couple the particle flow discrete element method with the finite element method. The cushioning effect of different overlying soils (sand and clay) on rockfall is studied. It is found that sand has better cushioning effect on rockfall impact, while clay has less cushioning effect on rockfall. By simulating the whole process of pipeline damage caused by falling rocks, the static load of pipeline caused by falling rocks after impact can not be ignored.
Starting from sand cushioning and stoning static load prevention, a protection project of "falling stone - buffer layer - protective structure - pipeline" is proposed. When using finite element and discrete element coupling to compare the same protective structure characteristics (buffer thickness, structure size and burial depth, etc.), the relative position (scheme 1: top-down buffer layer (sand bag) + structure (supporting beam and column) + pipeline; scheme 2: top-down structure (supporting beam and column) + buffer layer (sand bag) + pipeline) is different, and the appropriate protective effect of the two schemes is selected. Protection scheme.
重要日期
  • 会议日期

    08月24日

    2019

    08月25日

    2019

  • 06月15日 2019

    摘要录用通知日期

  • 07月30日 2019

    初稿录用通知日期

  • 07月31日 2019

    摘要截稿日期

  • 07月31日 2019

    初稿截稿日期

  • 08月15日 2019

    终稿截稿日期

  • 08月25日 2019

    注册截止日期

承办单位
教育部长江三峡库区地质灾害研究中心
联系方式
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询