High Voltage Alternating Current (HVAC) submarine cables are used to connect large offshore facilities to the onshore power grid leading to the removal of old, inefficient and polluting local power generators. Several issues have to be identified and addressed in the HVAC system design. These issues include reactive power compensation, switching equipment limits, and insulation coordination. The paper present example of 100km, 115kV HVAC submarine cable that used to transfer 90MW from onshore power grid to offshore Gas Oil separation Plant (GOSP) and the decommission of old Combustible Gas Turbine Generators (CGTGs).
关键词
submarine cable,HVAC,Offshore oilfield
报告人
Hassan Bekhit
Saudi Aramco

稿件作者
Hassan Bekhit Saudi Aramco
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    07月11日

    2023

    08月18日

    2023

  • 11月10日 2021

    初稿截稿日期

  • 12月10日 2021

    注册截止日期

  • 12月11日 2021

    报告提交截止日期

主办单位
IEEE IAS
承办单位
IEEE IAS Student Chapter of Southwest Jiaotong University (SWJTU)
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
IEEE PELS (Power Electronics Society) Student Chapter of HUST
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询