In a pumped storage power plant, there are long high-voltage cable connected the GIS and the main transformer, inducing different fast transient characteristics compared with conventional power substation. However, pumped-storage power plants are usually in remote mountainous areas, suitable testing opportunities are rare. Therefore, there are few research results on the field measurement of fast transient in pumped-storage power plants. In this paper, fast transients were measured in a 500kV pumped storage power plant. Sensors were developed and installed inside the GIS. The results indicated that the maximum amplitude levels of fast transient are 1.5 P.U. (close) and 1.14 P.U. (open). The voltage steepness of single strike is 0.777kV/ns. The frequency characteristics of fast transient waveforms in the pumped storage power station were also analyzed. The analysis results indicated the frequency components distribution. The high frequency component of fast transient above 10 MHz is very small. The field measurement data and analysis results provide a reference for reducing electromagnetic interference, developing standard waveform, optimizing insulation coordination and overvoltage mitigation methods.
关键词
GIS, fast transient, waveform characteristics, pumped storage power station
报告人
Wei Wang
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Beijing P.R. China, 102206;

稿件作者
Lijun Zhao Hebei Fengning Pumped Storage Co., Ltd., Fengning 068350, China
Lei Wang China Electric Power Research Institute, Wuhan 430074, Hubei Province, China;
Binqiang Xia State Grid Xinyuan Company LTD., Beijing P.R. China, 100761;
Liang Tang Hebei Fengning Pumped Storage Co., Ltd., Fengning 068350, China
Wei Wang State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Beijing P.R. China, 102206;
Kuigang Wang Zhejiang Xianju Pumped Storage Power Co., Ltd., Xianju 317312, China.
国明 马 华北电力大学新能源电力系统国家重点实验室
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    07月11日

    2023

    08月18日

    2023

  • 11月10日 2021

    初稿截稿日期

  • 12月10日 2021

    注册截止日期

  • 12月11日 2021

    报告提交截止日期

主办单位
IEEE IAS
承办单位
IEEE IAS Student Chapter of Southwest Jiaotong University (SWJTU)
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
IEEE PELS (Power Electronics Society) Student Chapter of HUST
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询