Research on Contact Wire Uplift of Typical High-speed Railway at 300km/h and 350km/h
编号:214 访问权限:仅限参会人 更新:2021-12-03 10:48:29 浏览:665次 口头报告

报告开始:2021年12月17日 10:00(Asia/Shanghai)

报告时间:15min

所在会场:[H] Other topics in Electrical Engineering [H3] Session 30

视频 无权播放 演示文件

提示:该报告下的文件权限为仅限参会人,您尚未登录,暂时无法查看。

摘要
For analysis of distribution rules on contact wire uplift of high-speed railway, the data of continuous contact wire uplift of typical high-speed railway at the speed of 300km/h and 350km/h was calculated and analyzed. The analysis results show that the contact wire uplift is positively correlated with the speed of the train. The uplift in the span is higher than the uplift at the registration point, besides, the contact wire uplift in the overlap and in the tunnel is relatively high. The inspection data calculation method and analysis results can provide effective data for the analysis and evaluation of the dynamic performance of the catenary, thereby infrastructure manager can more comprehensively grasp the operating status, and provide reasonable guiding proposals for operation and maintenance.
 
The statistical results of the contact wire uplift of the  typical lines at different speed levels are shown in Table 1. It can be seen from the statistical results that at the same speed level, the contact wire uplift at the registration point is slightly lower than that in span. When the train operation speed is 300km/h, the uplift at the registration point and in span shall not exceed 150mm, which conforms to the requirements of the pantograph dynamic envelope line of this speed level in the "Code for Design of Railway Traction Power Supply". The statistical results of the contact wire uplift at the speed of 350km/h are obviously greater than that at the speed of 300km/h, but they also basically meet the requirements of the above-mentioned design specifications. There are individual positions where the contact wire uplift exceeds 150mm, which should be paid attention to in operation and maintenance, and maintenance and adjustment should be carried out if necessary.
TABLE I
Statistical Table of Uplift of Typical Lines
Speed
(km/h)
Location Average value
(mm)
Quantile (mm) Proportion (%)
95% 98% >120mm >150mm  
300 registration point 63 90 98 0.07 0  
In span 81 112 122 2.26 0  
350 registration point 96 140 151 19.45 2.05  
In span 113 157 170 40.59 8.36  
References
[1]   Railway applications - Current collection systems - Technical criteria for the interaction between pantograph and overhead contact line (to achieve free access): IEC 62486 Ed. 2.0 b: 2017 [S]. 2017.
[2]   TB 10009-2016, Code for Design of Railway Electric Traction Power Supply[S].
[3]   Xu Jianfeng; Wu Jiqin; Zhang Jiawei; Research on the uplift characteristics of the registration point of the Beijing-Shanghai high-speed rail contact line[C]// Proceedings of the 2017 Annual Meeting and New Technology Symposium of the Electrification Committee of China Railway Society. 2017.
[4]   Qiao Lisheng. Design and implementation of contact line vibration detection system based on image processing technology[D]. Southwest Jiaotong University, 2009.
[5]   Yu Jie. On-line monitoring system for the uplift of the registration point of the contact line of the electrified railway[D]. Beijing Jiaotong University, 2012.
[6]   Huang Zhong, Wang Jiangwen, Mei Guiming, Che Chao, Yang Jia, Qiao Wei. Study on the dynamic characteristics of the wrist positioning system under the operating conditions of the bow and net[J]. Noise and Vibration Control,2020,40(05): 46-52.
[7]   Wu Yan, Wu Junyong, Zheng Jihao. Simulation analysis of dynamic current receiving performance of high-speed pantograph- contact line system[J]. Journal of Beijing Jiaotong University, 2009, 33(05): 60-64.
[8]   R. Fröhling, Ruplal M. Dynamic interaction between pantograph and overhead track equipment for heavy haul operations[J]. Vehicle System Dynamics, 2000, 33(sup1): 478-489.
[9]   Zhao Fei, Liu Zhigang, Zhang Xiaoxiao. Research on dynamic performance simulation of high-speed pantograph system based on finite element[J]. Journal of the China Railway Society, 2012(08): 37-42.
[10] Translated by China Railway Electrification Engineering Group Co., Ltd. Electrified Railway Contact Line. China Electric Power Press, 2004
[11]         Yu Wanju. High-speed electrified railway contact line[M]. Southwest Jiaotong University Press, 2003.
关键词
Catenary, Contact wire uplift
报告人
Wenxuan Zhang
Deputy director Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.

Meijun Mu
infrastructure inspection research institute, China academy of railway sciences corporation limited.

稿件作者
Wenxuan Zhang Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.
Meijun Mu Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.
Jing Wang Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.
Haiying Wang Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.
发表评论
验证码 看不清楚,更换一张
全部评论
重要日期
  • 会议日期

    07月11日

    2023

    08月18日

    2023

  • 11月10日 2021

    初稿截稿日期

  • 12月10日 2021

    注册截止日期

  • 12月11日 2021

    报告提交截止日期

主办单位
IEEE IAS
承办单位
IEEE IAS Student Chapter of Southwest Jiaotong University (SWJTU)
IEEE IAS Student Chapter of Huazhong University of Science and Technology (HUST)
IEEE PELS (Power Electronics Society) Student Chapter of HUST
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询