Variation of Transfer Time During the Full-voltage Making Test
transfer time,full-voltage making test,direct test circuit,synthetic test circuit
摘要录用
Xiaofei Yao / Xi'an Jiaotong University
Xiaoshe Zhai / Xi’an Jiaotong University
Wei Zhang / State key laboratory of electric insulation and power equipment
Ping Liu / Xi'an High Voltage Apparatus Research Institute Co., Ltd.
Transfer time denotes as a parameter, from the voltage breakdown to the initiation of high current, in a full-voltage making test of a circuit breaker. It is specified both in the international standard IEC 62271-100 and the national standard GB/T 4473-2008 that the transfer time must be lower than 300 μs during the making process. However, the transfer time presents varied characteristics even in a direct test procedure. Occasionally, it lasts for more than 300 μs in the full-voltage making test of a vacuum circuit breaker. Nowadays, there remains little knowledge on the variation of the transfer time. The objective of this paper is to explore the mechanism of the variation of the transfer time. Both a synthetic test circuit and a direct test circuit are used to perform the full-voltage making test on a test circuit breaker. The test circuit breaker used in this investigation includes a vacuum circuit breaker and a SF6 circuit breaker at 110 kV voltage level.
重要日期
  • 会议日期

    10月22日

    2017

    10月25日

    2017

  • 01月04日 2017

    摘要录用通知日期

  • 03月10日 2017

    初稿录用通知日期

  • 06月30日 2017

    终稿截稿日期

  • 10月25日 2017

    注册截止日期

联系方式
  • ice********
  • +86*********
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询