征稿已开启

查看我的稿件

注册已开启

查看我的门票

已截止
活动简介
What is the current status of GTL commercial projects and what are the challenges they face? Some LNG plants are built for CBM as feed gas. In North America, there are plans in the works for GTL plants that will use shale gas. These plans raise interesting questions—how will the economics work? What is the possibility of CBM/shale gas attracting GTL/LNG commercial projects in the coming 20 years? Some companies apply LNG technology to offshore gas fields. Will FLNG increase in the coming 20 years? Other companies apply micro channel technology to syngas and FTS units. How do we increase Micro-GTL over the coming 20 years? Ship-to-ship transfer of LNG is an enabling technology for the development of an offshore LNG supply chain, both floating liquefaction and regasification. The availability of efficient technical systems and components are necessary to make LNG loading/offloading from a floating unit, during poor weather conditions, possible. What are those systems and technological components? How can we maximise those systems to ensure effective and efficient LNG transfers for offshore purposes? The safety risks associated with GTL/LNG can be quite enormous if there is loss of controls/failures. What can we do differently in the GTL/LNG sector over the next few years to make the production process cycles in the industry safer? This workshop seeks to address all of these aspects related to industry issues and emerging technology for Liquefied Natural Gas (LNG) and Gas-to-Liquid (GTL).
征稿信息

征稿范围

Session 1: Development of Ship-To-Ship Transfer System for LNG Session 2: Effective Measures of Addressing Health and Safety Challenges Associated with the Operational Aspects of GTL/LNG Session 3: Integration of the Upstream and Downstream in GTL/LNG pro
留言
验证码 看不清楚,更换一张
全部留言
重要日期
  • 会议日期

    05月26日

    2014

    05月27日

    2014

  • 05月27日 2014

    注册截止日期

主办单位
美国石油工程师学会
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询